Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram Pinterest YouTube
    Idil News
    • Home
    • Puntland
    • Somalia
    • News in English
    Subscribe
    Idil News
    Home»News in English»Genale Dawa III hydropower project in Ethipoia 99% complete
    News in English

    Genale Dawa III hydropower project in Ethipoia 99% complete

    Jibril Qoobey.By Jibril Qoobey.November 10, 2019No Comments2 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link

    The Genale Dawa III hydropower project located in Southeast Ethiopia, is set to be operational soon. According to Chief Executive Officer of the Ethiopian Electric Power (EEP) Dr. Abraham Belay, the US $451m power project is 99% complete and will begin generation in less than two months’ time.

    Out of the total cost of the 254MW power project built on Dawa River, around US $67.8m was covered by the government of Ethiopia, while the remaining was covered by external loan. Genale Dawa III hydropower project Launched in 2010, the 110 meter high and 426 meter long dam has the capacity to hold 2.5 billion cubic meters of water.

    The project was suspended for more than a year due to problems associated with resettling of residents living near the dam. The project which was undertaken by China Gezhouba Group is expected to increase the country’s generation capacity to 4,514MW from the current 4,260MW.

    Ethiopia energy sector

    The energy sector is one of Ethiopia’s priorities as the country envisages to become a light manufacturing hub in Africa together with a middle-income economy by 2025. Ethiopia plans to increase its current 4,300 MW electricity generation capacity to 17,300 MW by 2025, with power generation projects in hydro, wind, geothermal and biomass sectors.

    Currently Ethiopia gets 90% its total electricity from 14 hydro-power generating plants with a total of installed capacity of almost 4514 megawatts. One of the biggest hydro-power projects EEP has been managing is the Grand Ethiopia Renaissance Dam (GERD), is completed around 70%, according to latest report of EEP.

    Follow on Google News Follow on Flipboard
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email Copy Link

    Related Posts

    What we know about Iran’s attack on US base in Qatar

    June 23, 2025

    Hubris and havoc: How Iran’s overconfidence may have led to ‘pre-emptive’ Israeli strikes

    June 13, 2025

    Survivor of Air India crash jumped out of emergency exit, police say

    June 12, 2025
    Latest Posts

    Ugu danbayn Xabad joojin Maraykanku amray,ayay Israa’iil iyo Iran wada qaateen

    Faallo:-Socdaalka Madaxweyne Axmed Madoobe Ee Garowe

    Iran oo Gantaalo ku weerartay Saldhiga Maraykanka Ee Qatar

    What we know about Iran’s attack on US base in Qatar

    Axmed Madoobe iyo weftigiisii oo gaaray Garowe ugu danbayn

    Faallo:-Miyaa la burburiyay Hubkii Niyukleerka Iran?

    Shir muhiim u ah Puntland oo Maanta ka furmay Garowe

    Ciidamada PL oo ku dhow in ay soo gabagabeeyaan hawlgalkii Cal-miskaad

    Maraykanka oo dukheeyay Xarumaha Niyukleerka Iran

    Jubaland:-Mw Axmed Madoobe oo kusii jeeda Garowe

    Facebook X (Twitter) Instagram Pinterest
    • Home
    • Puntland
    • Somalia
    • News in English
    © 2025 Idil News

    Type above and press Enter to search. Press Esc to cancel.