Close Menu
    Facebook X (Twitter) Instagram
    Facebook X (Twitter) Instagram Pinterest YouTube
    Idil News
    • Home
    • Puntland
    • Somalia
    • News in English
    Subscribe
    Idil News
    Home»News in English»Genale Dawa III hydropower project in Ethipoia 99% complete
    News in English

    Genale Dawa III hydropower project in Ethipoia 99% complete

    Jibril Qoobey.By Jibril Qoobey.November 10, 2019No Comments2 Mins Read
    Share
    Facebook Twitter LinkedIn Pinterest Email Copy Link

    The Genale Dawa III hydropower project located in Southeast Ethiopia, is set to be operational soon. According to Chief Executive Officer of the Ethiopian Electric Power (EEP) Dr. Abraham Belay, the US $451m power project is 99% complete and will begin generation in less than two months’ time.

    Out of the total cost of the 254MW power project built on Dawa River, around US $67.8m was covered by the government of Ethiopia, while the remaining was covered by external loan. Genale Dawa III hydropower project Launched in 2010, the 110 meter high and 426 meter long dam has the capacity to hold 2.5 billion cubic meters of water.

    The project was suspended for more than a year due to problems associated with resettling of residents living near the dam. The project which was undertaken by China Gezhouba Group is expected to increase the country’s generation capacity to 4,514MW from the current 4,260MW.

    Ethiopia energy sector

    The energy sector is one of Ethiopia’s priorities as the country envisages to become a light manufacturing hub in Africa together with a middle-income economy by 2025. Ethiopia plans to increase its current 4,300 MW electricity generation capacity to 17,300 MW by 2025, with power generation projects in hydro, wind, geothermal and biomass sectors.

    Currently Ethiopia gets 90% its total electricity from 14 hydro-power generating plants with a total of installed capacity of almost 4514 megawatts. One of the biggest hydro-power projects EEP has been managing is the Grand Ethiopia Renaissance Dam (GERD), is completed around 70%, according to latest report of EEP.

    Follow on Google News Follow on Flipboard
    Share. Facebook Twitter Pinterest LinkedIn Tumblr Email Copy Link

    Related Posts

    Puntland Forces Seized FGS infiltrated Camp in Galcaio, Puntland – Somalia

    August 6, 2026

    Puntland forces seize military compound after clashes with federal troops

    August 6, 2026

    In Response to the Statement on X on Galkacyo and Puntland by Former Somali PM, Mr Sharmake

    July 31, 2026
    Latest Posts

    Dugsiyada Waxbarashada Puntland oo berri fasax la galiyay

    Madaxweyne Deni oo noqday Madaxweynihii u horreeyay ee taga Towfiiq

    Doorashada aan haysan heshiiska ee Galmudug oo la qaadacay

    Puntland oo ka digtay in madax furasho la siiyo Burcad-badeeda (War-saxafadeed)

    EYL: Turkey oo duqeyn ku dilay kalluumeysato Reer Puntland ah

    Maxay yihiin maleeshiyaadka la wareegay Marka ?

    Madaxweyne Deni oo kormeeray Maxjarka dhoofinta Xoolaha ee Buubi

    Diyaaradaha F-16 ee Turkey oo maanta qeyb ka ah dhul boobka Muqdisho

    Madaxweyne Deni oo caawa ku hoyday deegaanka Balli-busle

    Cabdiraxmaan Cirro oo qaabilay Fahiima Quuje

    Facebook X (Twitter) Instagram Pinterest
    • Home
    • Puntland
    • Somalia
    • News in English
    © 2026 Idil News

    Type above and press Enter to search. Press Esc to cancel.